Dunning – Run – Manual Batches Overview

< All Topics
Print

Dunning – Run – Manual Batches Overview

The dunning batches have the following cycle.

  • Create a new batch (Batch status ‘Open’)
  • Optionally re-run the open batch (Batch status ‘Open’)
  • Optionally cancel the open batch
  • Close the open batch (Batch status ‘Closed’)

You can only create a new batch when the previous batch is closed

Table of Contents
Prev
Next
Drag
Map